[{"data":1,"prerenderedAt":87},["ShallowReactive",2],{"content-page:en:loan\u002Ffinancing\u002Fshould-i-consider-additional-financing":3},{"page":4,"alternates":82},{"id":5,"title":6,"asideNav":7,"backLink":8,"body":11,"description":68,"extension":69,"hero":7,"hideCreditCostWarning":70,"hidePageHeader":70,"locale":71,"meta":72,"navigation":73,"pageKind":74,"path":75,"seo":76,"seoDescription":77,"seoTitle":6,"slug":78,"stem":79,"translationKey":80,"__hash__":81},"pages\u002Fpages\u002Fen\u002Floan\u002Ffinancing\u002Fshould-i-consider-additional-financing.md","Should I consider additional financing?",null,{"href":9,"label":10},"\u002Fen\u002Ftopics","back",{"type":12,"value":13,"toc":64},"minimark",[14,23,30,37,44,47,54,57],[15,16,17,18,22],"p",{},"An ",[19,20,21],"u",{},"additional financing"," is referred to when the original construction project is more expensive than planned. As a result, an additional loan must be applied for to cover the costs.",[15,24,25,26,29],{},"This is often due to ",[19,27,28],{},"mistakes by the builder",", such as an incorrect calculation that is only noticed afterwards. But a sudden rise in the cost of building materials can also be a reason for the additional financing.",[15,31,32,33,36],{},"Lenders often grant this form of financing only on the condition of sufficient ",[19,34,35],{},"creditworthiness"," or the value of the property. A key reason for this is that, aside from the existing property, there are often no additional securities available.",[15,38,39,40,43],{},"An additional financing ",[19,41,42],{},"can be secured in the land register",", but it will always rank after the initial loan. If the funds to repay the loan cannot be raised and a foreclosure becomes imminent, repaying the original construction loan takes top priority. This is an aspect that is unattractive to lenders.",[15,45,46],{},"For the borrower, this type of financing is usually costly, yet it can be an option. The high time required to assess the securities and an exhausted loan-to-value limit are generally associated with a significant interest surcharge. If additional financing is the only alternative, it is advisable to make a detailed comparison of the terms offered by different providers.",[15,48,49,50,53],{},"To avoid additional financing, a ",[19,51,52],{},"careful cost planning of the construction project"," is essential. Contingencies such as unforeseen costs must be planned for from the start. It is always a good idea to seek professional advice before the construction project.",[15,55,56],{},"Another option is the provision of a reserve in the loan agreement. This is offered by some lenders. The maximum limit is around €20,000: a top-up financing that, depending on the capital requirement situation, is not always sufficient.",[15,58,59,60,63],{},"Essential factors for the ",[19,61,62],{},"financing of the additional costs"," are the property and the customer's creditworthiness. If problems arise in securing an additional financing, a guarantor can provide possible assistance.",{"title":65,"searchDepth":66,"depth":66,"links":67},"",2,[],"The capital requirement situation of a construction project","md",false,"en",{},true,"legacy-structured","\u002Fpages\u002Fen\u002Floan\u002Ffinancing\u002Fshould-i-consider-additional-financing",{"title":6,"description":68},"Should I consider additional financing? on Maxda.de - the provider for loans without Schufa, known from TV!","loan\u002Ffinancing\u002Fshould-i-consider-additional-financing","pages\u002Fen\u002Floan\u002Ffinancing\u002Fshould-i-consider-additional-financing","legacy-kredit-path-finanzierung-path-soll-ich-eine-nachfinanzierung-in-erwaegung-ziehen","ZaRoVrWv30D9U1yaWuDWOOuICiIkTVg-G5H2jfb9Jwg",[83,86],{"locale":84,"slug":85},"de","kredit\u002Ffinanzierung\u002Fsoll-ich-eine-nachfinanzierung-in-erwaegung-ziehen",{"locale":71,"slug":78},1795189512512]